Manufacturer for Pc-3110,405-60-Tpa 8 - Ship shore power distribution box – Yanger

Short Description:


RFQ

Product Detail

Product Tags

Related Video

Feedback (2)

We now have several exceptional workers customers good at marketing, QC, and working with types of troublesome trouble during the creation system for Shore power cable, Rubber Joint, Noncorrosive Gas Cylinders, Our organization has been devoting that "customer first" and committed to helping clients expand their small business, so that they become the Big Boss !
Manufacturer for Pc-3110,405-60-Tpa 8 - Ship shore power distribution box – Yanger Detail:

The ship shore power distribution box (hereinafter referred to as the shore power box) is a special ship power supply guarantee equipment installed in the port terminal. The device is suitable for a three-phase AC power distribution system with a working frequency of 50-60Hz and a rated working voltage of 220V/380V. It provides a fast and safe standard shore power interface for ships calling at the port, and realizes ship cable power supply, data collection, billing and settlement.

When ships are berthed or docked for repairs, they are generally connected to shore power. Especially for regular ships, docking at a certain wharf, the shore power connection device is installed on the wharf, so that the ship can use shore power as soon as the ship docks, and all the generator sets on the ship can be shut down. On the one hand, the generator set can be maintained or repaired normally.

Shore power operation:

(1) First, connect the power cable to the shore power terminal of the shore power box, close the shore power distribution switch, and the shore power indicator light on the shore power box is on.
(2) The phase sequence measuring device on the power box detects the phase sequence of the shore power, and the three-phase load of the phase sequence detector circuit is asymmetrical. When the phase connected to the capacitor is set to phase A, the brighter phase is phase B, and the darker phase is phase C. When the phase sequence of shore power and ship power is the same, close the switch in the shore power box If the phase sequence is inconsistent, the two of the shore power cables connected to the shore power terminal must be interchanged (these work is generally undertaken by the shore staff).
(3) Operation of shore power board In front of the main switchboard, when the shore power indicator on the board is on, it indicates that the shore power has been sent to the shore power switch of the main switchboard. At this time, the operation mode of the main generator and emergency generator should be set to the manual position. Disconnect the main switch of the generator and close the shore power switch immediately after the whole ship’s power grid loses power; if the shore power switch is on the emergency switchboard, the shore power switch should be closed before the emergency switchboard after the power grid is cut off. The ship’s power grid has been switched to shore power.

Connection box (4)

 

 


Product detail pictures:

Manufacturer for Pc-3110,405-60-Tpa 8 - Ship shore power distribution box – Yanger detail pictures

Manufacturer for Pc-3110,405-60-Tpa 8 - Ship shore power distribution box – Yanger detail pictures

Manufacturer for Pc-3110,405-60-Tpa 8 - Ship shore power distribution box – Yanger detail pictures

Manufacturer for Pc-3110,405-60-Tpa 8 - Ship shore power distribution box – Yanger detail pictures


Related Product Guide:

To be a result of ours specialty and service consciousness, our enterprise has won an excellent status between buyers all around the globe for Manufacturer for Pc-3110,405-60-Tpa 8 - Ship shore power distribution box – Yanger , The product will supply to all over the world, such as: Melbourne, Pretoria, Nairobi, We have customers from more than 20 countries and our reputation has been recognized by our esteemed customers. Never-ending improvement and striving for 0% deficiency are our two main quality policies. Should you need anything, don't hesitate to contact us.
Problems can be quickly and effectively resolved, it is worth to be trust and working together.
5 Stars By Amelia from Marseille - 2017.10.13 10:47
High production efficiency and good product quality, fast delivery and completed after-sale protection, a right choice, a best choice.
5 Stars By Modesty from Angola - 2017.05.02 11:33
Write your message here and send it to us