Massive Selection for Rsm03z150 Ac690v 350a - Ship shore power distribution box – Yanger

Short Description:


RFQ

Product Detail

Product Tags

Related Video

Feedback (2)

It really is our obligation to satisfy your requirements and efficiently serve you. Your fulfillment is our greatest reward. We're hunting forward to your check out for joint development for WWMS flow regulating valve, Pump assembly P-101, Danfoss instruments, To better expand market, we sincerely invite ambitious individuals and companies to join as an agent.
Massive Selection for Rsm03z150 Ac690v 350a - Ship shore power distribution box – Yanger Detail:

The ship shore power distribution box (hereinafter referred to as the shore power box) is a special ship power supply guarantee equipment installed in the port terminal. The device is suitable for a three-phase AC power distribution system with a working frequency of 50-60Hz and a rated working voltage of 220V/380V. It provides a fast and safe standard shore power interface for ships calling at the port, and realizes ship cable power supply, data collection, billing and settlement.

When ships are berthed or docked for repairs, they are generally connected to shore power. Especially for regular ships, docking at a certain wharf, the shore power connection device is installed on the wharf, so that the ship can use shore power as soon as the ship docks, and all the generator sets on the ship can be shut down. On the one hand, the generator set can be maintained or repaired normally.

Shore power operation:

(1) First, connect the power cable to the shore power terminal of the shore power box, close the shore power distribution switch, and the shore power indicator light on the shore power box is on.
(2) The phase sequence measuring device on the power box detects the phase sequence of the shore power, and the three-phase load of the phase sequence detector circuit is asymmetrical. When the phase connected to the capacitor is set to phase A, the brighter phase is phase B, and the darker phase is phase C. When the phase sequence of shore power and ship power is the same, close the switch in the shore power box If the phase sequence is inconsistent, the two of the shore power cables connected to the shore power terminal must be interchanged (these work is generally undertaken by the shore staff).
(3) Operation of shore power board In front of the main switchboard, when the shore power indicator on the board is on, it indicates that the shore power has been sent to the shore power switch of the main switchboard. At this time, the operation mode of the main generator and emergency generator should be set to the manual position. Disconnect the main switch of the generator and close the shore power switch immediately after the whole ship’s power grid loses power; if the shore power switch is on the emergency switchboard, the shore power switch should be closed before the emergency switchboard after the power grid is cut off. The ship’s power grid has been switched to shore power.

Connection box (4)

 

 


Product detail pictures:


Related Product Guide:

To continually enhance the management technique by virtue of your rule of "sincerely, great faith and high-quality are the base of company development", we widely absorb the essence of similar merchandise internationally, and continuously build new merchandise to meet the demands of customers for Massive Selection for Rsm03z150 Ac690v 350a - Ship shore power distribution box – Yanger , The product will supply to all over the world, such as: Bandung, Uganda, Vancouver, Now we have a dedicated and aggressive sales team, and many branches, catering to our main customers. We have been looking for long-term business partnerships, and ensure our suppliers that they will undoubtedly benefit in both short and long run.
The company has a good reputation in this industry, and finally it tured out that choose them is a good choice.
5 Stars By Gill from Morocco - 2017.02.18 15:54
The company account manager has a wealth of industry knowledge and experience, he could provide appropriate program according our needs and speak English fluently.
5 Stars By Letitia from Las Vegas - 2018.05.15 10:52
Write your message here and send it to us