New Fashion Design for Pt 4-Hesi(5×20) - Ship shore power distribution box – Yanger

Short Description:


RFQ

Product Detail

Product Tags

Related Video

Feedback (2)

Sticking for the perception of "Creating goods of high quality and making good friends with people today from all around the world", we constantly set the interest of shoppers to begin with for Motor bearing drive end Sea Water booster Pump for, Low Voltage Cable, Oil seal ring non drive end Sea Water booster Pump for demister, If you are interested in any of our products or would like to discuss a custom order, please feel free to contact us. We are looking forward to forming successful business relationships with new clients around the world in the near future.
New Fashion Design for Pt 4-Hesi(5×20) - Ship shore power distribution box – Yanger Detail:

The ship shore power distribution box (hereinafter referred to as the shore power box) is a special ship power supply guarantee equipment installed in the port terminal. The device is suitable for a three-phase AC power distribution system with a working frequency of 50-60Hz and a rated working voltage of 220V/380V. It provides a fast and safe standard shore power interface for ships calling at the port, and realizes ship cable power supply, data collection, billing and settlement.

When ships are berthed or docked for repairs, they are generally connected to shore power. Especially for regular ships, docking at a certain wharf, the shore power connection device is installed on the wharf, so that the ship can use shore power as soon as the ship docks, and all the generator sets on the ship can be shut down. On the one hand, the generator set can be maintained or repaired normally.

Shore power operation:

(1) First, connect the power cable to the shore power terminal of the shore power box, close the shore power distribution switch, and the shore power indicator light on the shore power box is on.
(2) The phase sequence measuring device on the power box detects the phase sequence of the shore power, and the three-phase load of the phase sequence detector circuit is asymmetrical. When the phase connected to the capacitor is set to phase A, the brighter phase is phase B, and the darker phase is phase C. When the phase sequence of shore power and ship power is the same, close the switch in the shore power box If the phase sequence is inconsistent, the two of the shore power cables connected to the shore power terminal must be interchanged (these work is generally undertaken by the shore staff).
(3) Operation of shore power board In front of the main switchboard, when the shore power indicator on the board is on, it indicates that the shore power has been sent to the shore power switch of the main switchboard. At this time, the operation mode of the main generator and emergency generator should be set to the manual position. Disconnect the main switch of the generator and close the shore power switch immediately after the whole ship’s power grid loses power; if the shore power switch is on the emergency switchboard, the shore power switch should be closed before the emergency switchboard after the power grid is cut off. The ship’s power grid has been switched to shore power.

Connection box (4)

 

 


Product detail pictures:

New Fashion Design for Pt 4-Hesi(5×20) - Ship shore power distribution box – Yanger detail pictures

New Fashion Design for Pt 4-Hesi(5×20) - Ship shore power distribution box – Yanger detail pictures

New Fashion Design for Pt 4-Hesi(5×20) - Ship shore power distribution box – Yanger detail pictures

New Fashion Design for Pt 4-Hesi(5×20) - Ship shore power distribution box – Yanger detail pictures


Related Product Guide:

Our eternal pursuits are the attitude of "regard the market, regard the custom, regard the science" as well as the theory of "quality the basic, believe in the 1st and management the advanced" for New Fashion Design for Pt 4-Hesi(5×20) - Ship shore power distribution box – Yanger , The product will supply to all over the world, such as: Barbados, Las Vegas, Puerto Rico, We've got constantly insisted on the evolution of solutions, spent good funds and human resource in technological upgrading, and facilitate production improvement, meeting the wants of prospects from all countries and regions.
Production management mechanism is completed, quality is guaranteed, high credibility and service let the cooperation is easy, perfect!
5 Stars By Harriet from El Salvador - 2017.11.11 11:41
This is the first business after our company establish, products and services are very satisfying, we have a good start, we hope to cooperate continuous in the future!
5 Stars By Judy from Gabon - 2018.09.29 13:24
Write your message here and send it to us